Renovating the new work space for Machination Studio.

4 days into it, I have ripped out all the wiring, the cable trunkings and have stripped down some walls. This weekend, I will start plastering and painting the sealer coat on the walls.

The place is over 40 years old, and has at least 5-6 layers of paint on it. It was like a bit of archaeology ripping through the layers. There was also an excess of cable trunking. This must have been used as a rental apartment at some stage because there was TV cables running into each room.

I suspect that I have bit off a bit more than I can chew. There is a lot of plastering and painting in my immediate future. Then would come running all the wiring, lights and switches. This will take a while.

Wish me luck.